Case Studies

Putting theory into practice

Verifying Emerging Pipeline Cracking Threats Using UT

Manage circumferential cracking threats to 814 km (506 miles) of pipeline located in conditions susceptible to this type of cracking.

Read More
Inspecting a Dual-Diameter Pipeline in a Single Run

A North American customer required an inspection of a dual-diameter pipeline owned and operated by the energy player – this was part of their…

Read More
Evaluation of Cracks in a Petroleum Pipeline

A crude oil pipeline in Canada presented a particularly challenging scenario for NDT Global. Short, branched axial cracks located close to the girth welds…

Read More
Equinor: Custom Solution for an Extreme Subsea Pipeline

Equinor required a baseline survey of its new Polarled gas pipeline as part of the commissioning process. When working with gas pipelines, inline inspections…

Read More
BP: A Custom Engineered Solution for Offshore Success

BP Angola needed a highly accurate baseline inline inspection (ILI) of the 36 km (22 mile) Plutao offshore deep water (up to 2,000 m/6,500…

Read More